Live market screen
Commercial Space Company Risk / Opportunity Ranking
Opportunity/risk view across launch, satellites, SAR, earth observation, defense demand, financing events, and execution risk.
Updated June 27, 2026
Opportunity view
Showing rows 81-100 of 438; 20 rows per page.
| Rank | Company | Score | Thesis / Evidence |
|---|---|---|---|
| 81 | Atomic-6 lowweak | Opp 4 Risk 5 | Thesis: Atomic-6 appears to have meaningful strategic upside because the membership rationale says it launched an orbital data center service and has DoD and U.S. Space Force contracts, which would support a long-duration defense/space infrastructure thesis if confirmed. Why now: The reviewed sources rationale cites article and says Atomic-6 launched an orbital data center service and has DoD and U.S. Space Force contracts, but no representative article or is provided in the visible reviewed sources, so timing confidence is limited. Caveats: No direct evidence or article are available in the reviewed sources body. Opportunity thesis relies on membership rationale rather than citable article summary. Because the underlying evidence is not exposed, conviction must stay low. |
| 82 | Beijing Guodian High-Tech Technology Co lowweak | Opp 4 Risk 2 | Thesis: Reviewed evidence rationale says the company received approval for a commercial satellite IoT pilot program using the Tianqi constellation of 41 satellites. Regulatory or pilot approval tied to an existing constellation is a meaningful long-horizon opportunity signal if execution follows. Why now: The implied catalyst is the pilot-program approval, but the reviewed sources provide no retained article summary or timestamped evidence row beyond the membership rationale. Caveats: Phase2 membership rationale references: but the actual summary/evidence are absent. Coverage debug shows articles after recent evidence window = 0 and evidence after recent evidence window = 0. Opportunity score is restrained because approval alone is described in rationale but not directly evidenced here. |
| 83 | D-Orbit lowweak | Opp 4 Risk 3 | Thesis: Moderate evidence-ranked opportunity: the reviewed sources membership rationale says D-Orbit partnered with Magdrive for an electric propulsion demo and places the company in satellite propulsion/orbital logistics, which suggests active technology development aligned with durable LEO and sustainability themes over a 1 year+ horizon. Why now: Why now is the partnership/demo claim referenced in article ID, but the reviewed sources includes neither nor explicit article timing beyond the article ID prefix, limiting recency precision. Caveats: Opportunity rests on membership rationale rather than fully available direct evidence. Referenced article ID has no in the reviewed sources. Demo activity is not the same as proven commercial traction. |
| 84 | Dhruva Space lowweak | Opp 4 Risk 2 | Thesis: Among this screen, Dhruva Space has one of the stronger reviewed sources rationales: it is described as having received a government grant for Project Garud, a 500 kg-class satellite platform for constellation-scale missions, and later partnering with ICEYE on satellite systems and Earth observation services. If current, those items imply platform and partnership traction that could matter over a 1 year+ horizon. Why now: The reviewed sources references: and: in the membership rationale, suggesting relatively recent strategic developments, but the coverage report still shows zero evidence after recent evidence window, so timing confidence is limited. Caveats: Positive thesis relies on membership rationale, not available direct evidence. Partnership evidence cannot be expanded through relation propagation beyond what is explicitly stated. |
| 85 | EDGX lowweak | Opp 4 Risk 3 | Thesis: Reviewed evidence rationale indicates EDGX is a Belgian spacetech startup with a prior €2.3M seed round and an in-orbit demonstration of its STERNA AI computing system on SpaceX Transporter-16. If still current, in-orbit validation plus prior funding can support a longer-horizon commercialization opportunity. Why now: The membership support references articles, and, implying a narrative of funding plus orbital demonstration, but active evidence remains empty after recent evidence filtering, limiting recency confidence. Caveats: In-orbit demo claim appears only in reviewed sources rationale, not available direct evidence. No evidence confirms whether the prior seed round falls within the current decision horizon relevance. No direct adverse evidence is present, but that is not proof of low fundamental risk. |
| 86 | Ellipsis Drive lowweak | Opp 4 Risk 3 | Thesis: Moderate opportunity on sparse evidence: the reviewed sources membership rationale describes Ellipsis Drive as addressing an Earth observation satellite-data processing bottleneck, with support from space agencies and target users including Earth observation firms. If accurate, that points to a software-layer position that could benefit over a 1 year+ adoption cycle. Why now: Why now is the reviewed sources' claim that the company addresses a key EO data-processing bottleneck and has space-agency support, referenced to article ID: though no or timestamp detail was provided. Caveats: Claims come from membership rationale rather than direct evidence. Referenced article ID: lacks a reviewed sources. Support from agencies and target users is weaker than demonstrated contracted revenue. |
| 87 | Eta Space lowweak | Opp 4 Risk 2 | Thesis: Eta Space has reviewed sources support that its LOXSAT mission will demonstrate 11 cryogenic fluid management technologies in space and that the mission is launched by Rocket Lab for NASA, indicating real technology validation relevance for in-space fueling or orbital servicing over a 1 year+ horizon. Why now: The membership rationale specifically points to the LOXSAT mission demonstration as the current relevance driver, citing article: but the reviewed sources does not include the article or more detailed dated evidence fields. Caveats: Underlying article is not provided in the reviewed sources. Score is based on membership rationale summary rather than available direct evidence. Single-mission validation is weaker than broad commercial traction. |
| 88 | Firefly Aerospace lowweak | Opp 4 Risk 2 | Thesis: Firefly has a positive long-horizon lunar infrastructure angle because recent article context says NASA awarded it a Moon Base contract for MoonFall, a 2028 mission to transport four drones for Artemis-site surveying. Why now: A dated May 26, 2026 article puts a fresh NASA program win into the current evidence window, which can matter over a 1 year+ horizon even if revenue realization is later. Evidence
Caveats: Only one within the recent evidence window article is available. Evidence is supporting article context rather than stronger extracted direct events. Timing of mission realization is long-dated relative to the evidence window. |
| 89 | Hispasat lowweak | Opp 4 Risk 2 | Thesis: The reviewed sources membership rationale states Hispasat is part of the IRIS2 project and will manage the LEO shell. If current, that implies meaningful strategic positioning in a long-duration European satcom infrastructure program. Why now: The only timing clue is the membership rationale referencing article, but the underlying article summary and are not included in these reviewed sources. Recency beyond the batch month label is uncertain. Caveats: No representative article or is available in the reviewed sources despite the favorable rationale. Program-role evidence can be important, but without economics or milestones the opportunity case is incomplete. |
| 90 | Impulse Space lowweak | Opp 4 Risk 4 | Thesis: Membership rationale ties Impulse Space to a Pentagon deal for space-based interceptor prototypes and identifies orbital transfer vehicle relevance, which would be strategically meaningful over a 1 year+ horizon if confirmed with current evidence, but the reviewed sources does not load the underlying evidence or article summaries after recent evidence window, unavailable in reviewed sources). Why now: Why now is only medium because defense-space prototype work can matter over a 1 year+ horizon, but the reviewed sources' available evidence is empty after recent evidence window, preventing higher-conviction ranking. Caveats: No current evidence is provided for. No direct evidence remained after the recent evidence filter. Potential opportunity rests on membership rationale rather than available corroborated evidence. |
| 91 | MDA Space Ltd. lowweak | Opp 4 Risk 3 | Thesis: MDA Space shows some opportunity context from being identified as operating in in-orbit servicing and from an article saying it won a Radarsat replenishment satellite contract, which could support durable government-space demand if current. Why now: Why-now is weak because both available representative articles are undated, so current timing and whether these items remain incremental versus already absorbed is uncertain Evidence
Caveats: Both cited articles are undated; recency is uncertain. Support is weak and based on article context, not direct positive events. No material adverse evidence is available, but no strong current catalyst is validated either. |
| 92 | Modul8 lowweak | Opp 4 Risk 3 | Thesis: Reviewed evidence membership rationale says Modul8 is a spun-out space communications unit with $40m funding, lunar cellular network deployment, and Artemis spacesuit communications work. If still current, that is among the stronger long-horizon strategic opportunity setups in this screen, but the reviewed sources does not provide citeable direct evidence or article. Why now: Among sparse names, the stated combination of funding plus lunar communications program exposure could matter over 1 year+, but recency cannot be validated from served evidence. Caveats: The strongest claims are only in membership rationale and not backed by citeable -bearing evidence in the reviewed sources. No negative evidence does not equal low fundamental risk. |
| 93 | Momentus Inc lowweak | Opp 4 Risk 5 | Thesis: Membership rationale says Momentus secured a new commercial contract for its Vigoride-9 orbital service vehicle and identifies the company as an orbital service vehicle / orbital services platform business, which would support a real opportunity thesis for space logistics if current and corroborated. However, these reviewed sources have no direct evidence or article summaries after recent evidence window, so the opportunity score must stay modest (: and: unavailable in reviewed sources). Why now: Why now is medium because an orbital services contract can matter over a 1 year+ horizon, but the reviewed sources' post-recent evidence window evidentiary absence prevents stronger timing confidence. Caveats: No direct evidence remained after the recent evidence filter. |
| 94 | NEC Corporation lowweak | Opp 4 Risk 2 | Thesis: Membership rationale states NEC launched an Orbital Transfer Vehicle development project selected by JAXA and aims for Asia's first OTV deployment. That would be a credible long-horizon strategic opportunity if current, but the reviewed sources provide no available direct evidence or article summaries inside the recent evidence window to validate progress (: unavailable in reviewed sources). Why now: Why now is medium rather than weak because an OTV development project can be durable over 1 year+, but evidentiary support in the reviewed sources are thin after recent evidence window. Caveats: No current evidence is provided for No direct evidence remained after the recent evidence filter. Current milestone timing is unverified in the reviewed sources. |
| 95 | NewOrbit Space mediummedium | Opp 4 Risk 4 | Thesis: NewOrbit Space has a plausible long-horizon opportunity because an article says it is developing satellites for very low Earth orbit and raised $18.5 million in a Series A round, suggesting both a differentiated technical focus and capital to pursue it. Why now: Why now is weaker than Aavuus because the article has no publication date. The reviewed sources explicitly says no is available and recency-sensitive claims should be treated cautiously., undated Evidence
Caveats: Evidence is supporting article context only, not direct structured positive event evidence. Publication date is unavailable; recency is uncertain. Single-article support only; no independent confirmation. |
| 96 | NorthStar Earth & Space lowweak | Opp 4 Risk 3 | Thesis: NorthStar Earth & Space appears strategically relevant to space domain awareness and may have public-market access or financing optionality via a SPAC path, but these reviewed sources provide only limited supporting article context and no strong in-window direct facts for business traction. Why now: The only dated evidence in this row is an April 27, 2026 article-level summary stating NorthStar Earth & Space plans to go public in a SPAC deal at a $300 million valuation. That may matter over a 1 year+ horizon, but the reviewed sources does not provide stronger company-specific direct evidence here. Evidence
Caveats: Coverage is extremely thin in this row: only one external article and no direct positive or negative dated events. The phase-2 rationale mentions a CAD$40M+ Royal Canadian Air Force contract, but that contract evidence is not directly surfaced in the available evidence fields for this output row, so it should not be elevated beyond the membership rationale. |
| 97 | Obruta Space Solutions lowweak | Opp 4 Risk 4 | Thesis: Obruta operates in a strategically attractive area: autonomous docking for on-orbit servicing and logistics, with stated use cases including inspection, orbital refueling, satellite life extension, debris removal, and orbital logistics. That gives a plausible long-horizon opportunity narrative if product or customer validation emerges. Why now: The only dated visible evidence is a company-site page with a May 20, 2026 describing the technology and target markets, which is relevant for strategic positioning but not enough to prove commercial inflection within the next year. Evidence
Caveats: Evidence is company-site descriptive context only. No third-party validation, financing, contract, or deployment evidence is shown. |
| 98 | Observable Space lowweak | Opp 4 Risk 4 | Thesis: Moderate opportunity based on the reviewed sources membership rationale that Observable Space was listed among notable space startup funding deals at $90 million. A funding round of that size can support growth over a 1 year+ horizon if deployed effectively. Why now: Why now is the funding mention tied to article ID: but the reviewed sources provide no, operating specifics, or additional corroborating evidence. Caveats: Funding alone is positive evidence but does not prove business quality. Article ID: is referenced without. |
| 99 | OMSPACE lowweak | Opp 4 Risk 4 | Thesis: The reviewed sources membership rationale says OMSPACE successfully launched a sounding rocket and plans an orbital launch vehicle by 2027 for small satellites. That suggests a real technical progression path if the company can convert suborbital progress into orbital capability over the next year-plus. Why now: The reviewed sources' rationale references article: for a successful sounding-rocket launch and a 2027 orbital-launch target, but the underlying article summary/ is not included here, limiting recency and sequence assessment. Caveats: Evidence is limited to a broad membership rationale without article detail. A sounding-rocket success is meaningfully earlier-stage than an orbital launch business. Risk and opportunity are both elevated relative to peers because the technology path is ambitious but still lightly evidenced. |
| 100 | Orbital lowweak | Opp 4 Risk 3 | Thesis: Orbital has modest evidence-backed opportunity because a dated within the recent evidence window article says it raised $5 million to fund an in-orbit computing demonstration next year and support initial work on its first purpose-built orbital compute satellite, Orbital-1, slated for 2028, indicating financing plus roadmap progress relevant to a 1 year+ horizon, June 10, 2026). Why now: The recency is relatively fresh: the is based on June 10, 2026, inside the 90-day recent evidence window, and it frames both new capital and a next-year demo as near-to-medium-term strategic milestones. Evidence
Caveats: All retained evidence is weak context supporting article context; there is no direct positive event/fact available. Same-article repeated rows are not independent confirmation. The opportunity case depends on an early-stage roadmap and financing announcement; commercial traction is not directly evidenced in retained rows. |
Risk view
Showing rows 281-300 of 438; 20 rows per page.
| Rank | Company | Score | Thesis / Evidence |
|---|---|---|---|
| 281 | COMSAT lowweak | Opp 0 Risk 1 | Thesis: No material adverse thesis is supported either. The reviewed sources only provides thin acquisition-context mention, so risk remains low-scored for lack of evidence rather than comfort. Why now: No 90-day article summaries or evidence were available for COMSAT in these reviewed sources, so there is no supported timing catalyst. Caveats: Relations/context-only style mention should not be used as counterparty propagation evidence. Phase2 rationale references article ids: and: but no or summaries are provided in the reviewed sources. No direct evidence were available after recent evidence window. |
| 282 | Comtech Telecommunications Corp. lowweak | Opp 1 Risk 1 | Thesis: No material adverse thesis can be supported from these reviewed sources because no direct negative evidence are provided within the recent evidence window. Why now: There is no usable company-specific evidence in the reviewed sources after recent evidence filtering; coverage data shows zero article IDs after recent evidence window and zero evidence available, so there is no current catalyst basis in these reviewed sources. Caveats: Absence of evidence is not positive evidence. Reviewed evidence notes only weak peer-group context in phase2 rationale, but no citable article details are included in the scoring fields. |
| 283 | Cosmoserve lowweak | Opp 1 Risk 1 | Thesis: No material adverse company-specific evidence is provided. The primary risk is simply that the evidence is too indirect to support a real thesis. Why now: No in-recent evidence window article summary or evidence row was available for Cosmoserve, so there is no supported catalyst timing. Caveats: The mention is article-level and indirect rather than company-specific. Phase2 rationale references article id: but no or summary is included. No direct evidence were available after recent evidence window. |
| 284 | Cosmoserve Space lowweak | Opp 1 Risk 1 | Thesis: No retained 90-day negative evidence supports a risk thesis. Why now: The reviewed sources retains zero evidence after the recent evidence filter, leaving no current catalyst or recency-supported business update. Caveats: Only one historical article was considered and none are retained within the recent evidence window. The single membership support item is not enough for a current directional call. This is effectively a watchlist placeholder until newer evidence appears. |
| 285 | Curtiss-Wright Corporation lowweak | Opp 2 Risk 1 | Thesis: No material adverse evidence is available. The main risk is evidentiary weakness: supplier-beneficiary framing without direct contract, backlog, or financial evidence leaves the thesis unproven. Why now: Potentially relevant if broader space spending is increasing, but the reviewed sources provide no retained dated evidence, no current data, so timing and magnitude cannot be validated. Caveats: No current evidence is provided for Relation/context evidence must not be used as counterparty propagation; reviewed sources notes context only. No available direct evidence after recent evidence window despite high article count considered. |
| 286 | Deloitte lowweak | Opp 2 Risk 1 | Thesis: No material negative evidence is retained in the reviewed sources. Why now: The reviewed sources rationale says Deloitte launched satellites for Project Constellation to test on-orbit cyber protections and contracted Spire to design, build, and operate satellites, citing article, but no or retained evidence row is available after recent evidence window, limiting confidence. Caveats: The described activity comes only from membership rationale rather than retained evidence. Without retained dated evidence or, chronology and durability cannot be tested. |
| 287 | Digantara lowweak | Opp 1 Risk 1 | Thesis: No retained 90-day negative evidence supports a material risk call. Why now: Despite several historical mentions, the reviewed sources show zero retained article IDs and zero evidence after recent evidence filtering, so there is no recent catalyst evidence in the served data. Caveats: Historical support mentions approximately $50M funding, but the underlying evidence is not retained within the current recent evidence window reviewed sources. Low scores reflect missing current evidence, not a negative operating judgment. |
| 288 | Digantara lowweak | Opp 1 Risk 1 | Thesis: No direct adverse evidence is provided in the reviewed sources. The main issue is lack of current evidence within the recent evidence window, so risk cannot be ranked highly. Why now: There is no strong 'why now' because coverage data shows zero article IDs after recent evidence window and zero evidence after recent evidence window, so any thesis would be under-supported for current timing. Caveats: No evidence remained after the 90-day recent evidence window. Phase-2 membership rationale is not enough for a directional thesis by itself. Recency and business-state claims are unavailable in the reviewed sources. |
| 289 | DPhi Space lowweak | Opp 1 Risk 1 | Thesis: No material adverse thesis is supported. The main issue is lack of substantiated company-specific evidence. Why now: No available article summaries or evidence exist after recent evidence window for DPhi Space in these reviewed sources, so there is no supported why-now catalyst. Caveats: Support level is only provisional_single_article_context in the reviewed sources. Phase2 rationale references article id, but no or summary is included. No evidence were available after recent evidence window. |
| 290 | Elbit Systems Ltd. lowweak | Opp 1 Risk 1 | Thesis: Despite broad defense and geopolitical exposure implied by context, the reviewed sources have no direct negative evidence within the recent evidence window, so no adverse thesis is supportable. Why now: Membership rationale references articles: and, but coverage data shows articles after recent evidence window = 0 and evidence after recent evidence window = 0. unavailable in reviewed sources. Caveats: Large mention volume is not conviction. Defense-space context is not directional proof. Referenced have no in the reviewed sources. |
| 291 | Element U.S. Space & Defense lowweak | Opp 0 Risk 1 | Thesis: No direct adverse evidence is retained, but the company is especially thinly covered in these reviewed sources, which raises uncertainty rather than a demonstrable risk case. Why now: Why now is absent because only 2 articles were considered and none survived the 90-day filter; there is no current evidence basis for a 1 year+ directional call. Caveats: Coverage is extremely sparse. The only described relation is context/service oriented and relations are context-only unless policy-gated. No post-cutoff evidence available. |
| 292 | Emposat lowweak | Opp 1 Risk 1 | Thesis: No material adverse evidence is available within the reviewed sources' recent evidence window. Why now: There is no available within the recent evidence window evidence row after the March 29, 2026 cutoff; coverage data shows zero article IDs after recent evidence window and zero evidence after recent evidence window for Emposat. Caveats: Phase-2 membership rationale references articles and, but the reviewed sources provide no for citation. Ground-station context is indirect and not enough for a strong thesis under the evidence standard. |
| 293 | EnduroSat lowweak | Opp 1 Risk 1 | Thesis: No material adverse evidence is provided in the reviewed sources after recent evidence filtering, so a negative thesis is unsupported. Why now: Why now is unsupported because no evidence remain after recent evidence filtering; there is no dated catalyst, financing, contract, production, or customer evidence available here. Caveats: No surviving evidence after recent evidence filtering. Reviewed evidence counts indicate evidence existed upstream, but none is included here for direct citation. Low scores reflect missing evidence, not a fundamental negative judgment. |
| 294 | Filtronic PLC lowweak | Opp 2 Risk 1 | Thesis: No material adverse thesis is supported because no direct negative evidence is retained in the reviewed sources. Why now: There is no evidenced near-term or durable why-now catalyst inside the retained 90-day evidence window. Caveats: Reviewed evidence references but provides no representative article. Potentially positive older context may be stale or superseded; recency cannot be validated. No retained evidence after recent evidence window. |
| 295 | FOSSA Systems lowweak | Opp 1 Risk 1 | Thesis: No material adverse evidence is available in the reviewed sources, so there is no supported risk thesis beyond generic startup and execution uncertainty, which is insufficient under the evidence rules. Why now: No within the recent evidence window evidence are available after filtering, so there is no near-dated trigger or state change that can be scored from the local reviewed sources. Caveats: Membership support references article, but that article content is not available here for direct citation. Coverage debug shows zero evidence after recent evidence window. A positive thesis requires positive evidence, not just category fit or membership rationale. |
| 296 | Fujitsu lowweak | Opp 3 Risk 1 | Thesis: No material negative evidence is available. The main risk is that space may remain too small a contributor within Fujitsu's broader business to drive a distinct thesis, but this is an inference from the reviewed sources' boundary ambiguity rather than direct adverse evidence (: and; not provided in reviewed sources). Why now: An MOU in SDA could matter over a 1 year+ horizon if it converts into deployments or service revenue, but the reviewed sources offers no direct dated evidence inside recent evidence window and no article to validate timing. Caveats: Large diversified company; reviewed sources does not show materiality of space effort. MOU is weaker than signed commercial contract revenue evidence. No direct article content or is available in reviewed sources. |
| 297 | GE Aerospace lowweak | Opp 1 Risk 1 | Thesis: No reviewed sources-supported adverse thesis is available. There is also no material direct negative evidence after the 90-day recent evidence window. Why now: There is no current catalyst in the reviewed sources. Coverage shows 32 article IDs considered but zero article IDs after recent evidence window and zero evidence after recent evidence window, so recency-based ranking is not supported. Caveats: Phase2 rationale says only generic stock-screener style article context was available, citing article IDs, and, but no were provided in the reviewed sources. Evidence recent evidence review shows no current evidence was retained and undated_rows_kept = 0. Without for the cited membership-support articles, they cannot be used as factual thesis evidence under the citation requirement. |
| 298 | Gilat Satellite Networks Ltd. lowweak | Opp 1 Risk 1 | Thesis: Insufficient retained local evidence within the 90-day recent evidence window to support a material adverse thesis. Why now: No company-specific dated evidence were retained after the 90-day recent evidence window cutoff of March 29, 2026, so there is no current catalyst basis in the reviewed sources. Caveats: Reviewed evidence shows 64 articles considered but 0 article IDs after recent evidence window and 0 evidence retained. Membership support cited article IDs: and: but no article summaries or retained evidence are provided in these reviewed sources, so no factual thesis claims can be grounded from them. |
| 299 | GS Yuasa Corporation lowweak | Opp 3 Risk 1 | Thesis: No material adverse evidence is retained. The main limitation is that the reviewed sources does not prove the scale, growth, or competitiveness of GS Yuasa's space exposure. Why now: There is no verified near-term catalyst, but the reviewed sources' phase-2 rationale references saying GS Yuasa was named as a key player in a space battery market report. Without, timing detail, or retained evidence, recency is uncertain. Caveats: The rationale cites, but no or retained article text is provided. Being listed as a key player in a market report is weaker than direct contract, launch, or financial evidence. No retained evidence remain after the 90-day recent evidence window. |
| 300 | HawkEye 360, Inc. lowweak | Opp 2 Risk 1 | Thesis: Government concentration or defense-program dependence could be a risk, but the reviewed sources contain no direct negative evidence within the available recent evidence window. Why now: There is no available post-recent evidence window evidence in the reviewed sources to establish a current catalyst or changed business state. Caveats: No evidence available after recent evidence window. Cannot rely on membership rationale alone for direction. |